A pre-handover inspection is an independent check of a new property before you accept it from the developer. It is the single moment when you have the most leverage, and the cheapest point at which to get defects fixed.

What it is

Also called a snagging inspection, it is a systematic check of a newly built condo or villa against a written checklist: finishes, structure, waterproofing, plumbing, electrics, air conditioning, doors and windows, and for villas the roof, drainage, pool and external works. Every defect is photographed, located and classified, and the result is a report the developer can work from.

When to book it

Book it as soon as the developer gives you a handover date, and schedule the inspection a few days before you are asked to sign. That leaves time for the report to reach the developer while they still need your signature. If you have already taken the keys, it is not too late: an inspection within your warranty period still works — see the defects-liability period.

What it covers

Every inspection follows our published inspection checklist, so you can see exactly what will be checked. In outline:

  • Around 100 checks for a condo and 130–150+ for a pool villa
  • Every tap, drain, socket, RCD and air conditioner tested in operation
  • Wet areas and ceilings below terraces checked, with moisture and thermal testing wherever problems are suspected
  • Falls checked with a laser level and floor tiles percussion-tested
  • Roof, gutters, external walls, pool plant and bonding on villas
  • Doors, windows, locks and sliding tracks operated and checked

On the day

Expect three to six hours on site, depending on the property. You are welcome to attend, but most clients are overseas and do not. We need power and water connected, access to every room and the roof where possible, and ideally the developer’s representative on site. If you want to walk the property yourself as well, our walkthrough guide and the free inspection sheets will help.

What you get afterwards

Within 48 hours you receive a photographed report with every item classified by severity and a remedy written for the builder, plus a schedule the developer can sign against. You can see the format in the sample report. Our guide on dealing with your developer explains how to present it, and our project management service can see the repairs through.

What it costs

Fees are fixed and published: condos from 15,000 THB, two-bed pool villas 30,000 THB and three to four bed villas 40,000 THB. See fees. The same fees apply on Koh Samui.

Still have questions? Read our FAQ, or see all our services.

Handover date set? Book your inspection.

Tell us the development and your handover date. We’ll confirm a fixed fee and an inspection date before it.

Chat on WhatsApp