Phuket Property Care

The developer’s walkthrough is not an inspection.

Every buyer gets a walkthrough before handover. It is useful, but it is run by the people who built the property, on their timetable, looking at what they choose to show you.

What the walkthrough is for

The walkthrough is the developer’s handover process: showing you how things work, handing over keys and manuals, and collecting your signature that the property has been received. Most site teams are genuinely trying to hand over a good property. But the walkthrough is designed to end in a signature, and it usually lasts under an hour.

What it usually misses

Almost everything that costs money later is invisible on a dry, sunny handover morning. In a typical walkthrough nobody:

  • Taps every floor and wall tile to find hollow, unbonded areas
  • Runs every shower, basin and air conditioner at the same time and checks where the water goes
  • Measures moisture at skirtings, thresholds and below terraces
  • Uses a thermal camera to find hidden leaks, missing insulation or overheating electrics
  • Tests every socket and checks the earth bonding at the pool and wet areas
  • Checks falls on terraces and in showers with a level

What an independent inspection adds

An independent inspector works through the property systematically, against a published checklist, with the tools to find what is not visible — and works for you, not the developer. The result is a written, photographed list with every defect located, graded by severity and given a remedy, which the site team can work from without arguing about what was meant. Ours arrives within 48 hours; see a sample report.

Do them in the right order

The most useful order is: independent inspection a few days before the walkthrough, report sent to the developer, then the walkthrough used to agree what will be fixed and by when. That way the walkthrough becomes a technical conversation about a specific list, not a signing ceremony. If the developer agrees, the inspector can attend the walkthrough with you.

Be careful what you sign

Handover forms often include a line confirming the property was received in good condition. Before you sign anything, make sure outstanding defects are listed on the form or attached to it, and keep a copy. Whether you can defer handover or retain money against defects depends on your contract, so ask your lawyer before the day, not after. Our guide to what to do if defects aren’t fixed covers the next steps.

A note on advice

This guide is practical experience from site, not legal advice. Contracts differ; a Thai property lawyer can tell you what yours allows at handover.

Walkthrough booked? Get inspected first.

Tell us the development and the date of your walkthrough. We will confirm a fixed fee and an inspection date a few days before it.

Chat on WhatsApp